Up Adit Collapse Dig, Nentsberry Haggs Mine, (25/05/08 - 23/05/09) Prev Next Slideshow

 Previous image  Next image  Index page
 
 
 
 
01_lunch
  03_1m_progress.jpg - 1st Dig,25/05/08: At about the 1 metre mark, more rock face was uncovered as well as the roof line on the right hand side.  
04_1m_progress
05_2m_progress
06_waterbreak_progress
08_drainclear1
02_tools&materials2

1st Dig,25/05/08: At about the 1 metre mark, more rock face was uncovered as well as the roof line on the right hand side.
Total images: 40 | Last update: 01/07/11 16:22 | Help