Up Smallcleugh Mine - Beyond Bogg Shaft 3 - Sublevels and Surveys, (30/09/06) Prev Next Slideshow

 Previous image  Next image  Index page
sc_sublev_oretruck2
sc_sublev_junction_artifacts
sc_sublev_dynamite
sc_sublev_fuseand_dets
sc_sublev_oretruckwithparts
  sc_sublev_concretelabel.jpg - In the main level that serviced the stope above an explosives label could be seen stuck to the concrete arching, this probably was used to block up a hole in the shuttering used to form the arching.  
sc_sublev_passage1
sc_sublev_passage2
sc_sublev_longcrystalisedstaws
sc_sublev_crystalisedstraw2
sc_sublev_crystalisedstraw1

In the main level that serviced the stope above an explosives label could be seen stuck to the concrete arching, this probably was used to block up a hole in the shuttering used to form the arching.
Total images: 29 | Last update: 08/07/11 09:27 | Help